Weiheng Engineering · Version 1.0 · November 3, 2026

Robot Joint FAT/SAT and Measurement Acceptance Decision Matrix

Assign each requirement to a declared DUT, method, condition, measurement chain, tolerance, evidence record, verification stage, owner, exception route and authorized sign-off. Silence is not compliance.

Stage boundary

StagePrimary decisionRequired evidenceNot proven
R&D characterizationBehavior across declared conditionsSynchronized data, calculations, state and validity recordEvery-unit release
EOL screeningUnit release under the approved sequenceUnit ID, recipe, checks, result, exception and dispositionFull design characterization
FATAgreed factory configuration and methodsSamples/utilities, checks, selected runs, deviations, punch list and witnessBuyer-site installation
SAT / commissioningDelivered system within the agreed site boundaryInstallation, utilities/interfaces, agreed runs, training, open items and sign-offExcluded requirements
Production releaseControlled routine measurement processReleased method, trained roles, reference checks, permissions, backup and escalationCapability after uncontrolled change

Requirement-to-acceptance record

Requirement ID / revisionBuyer requirementSupplier responseDUT / method / conditionMeasurement / decision ruleEvidence / stage / ownerStatus / sign-off
Compliant / Deviation / Option / Excluded / Clarification required

Exception and retest

Record IDObserved condition / impactContainment / owner / due dateCorrection or configuration changeRetest link / disposition / approval

Scope limit: No universal Weiheng tolerance, uncertainty ratio, cycle time, delivery, warranty or acceptance value is asserted. Remote commissioning does not automatically replace agreed SAT or buyer sign-off.