Weiheng Engineering • Version 1.0 • 2026-10-15

Robot Joint EOL Traceability and Release Evidence Chain

Use this worksheet to connect each production release decision to its approved requirement, identified unit, active station and recipe versions, valid evidence, decision logic, exception history, data acknowledgement and final sign-off. Complete it during RFQ, proposal, design, FAT, SAT and release planning; do not treat blank fields or silence as compliance.

Project identification

ProjectDUTRevision
BuyerSupplierDate

Eight linked records

Buyer input: Known / Target / TBD / Supplier-proposed / Excluded. Supplier response: Compliant / Deviation / Option / Excluded / Clarification required.

IDEvidence gateRequired linkBuyer input / revisionSupplier response / basisRequired record and verification stageOwner / exception / sign-off
EOL-R01Requirement and production riskNamed release requirement, detectable manufacturing risk and decision ownerRequirement ID, revision, risk and approved test/record route
EOL-R02Unit and product identityPhysical unit to model, variant, lot/order and included revisionsSerial/unique ID, BOM/drawing, hardware, firmware and parameter versions
EOL-R03Station and recipe baselineUnit identity to approved fixture, instruments, software, sequence, calculation and limitsStation, fixture, channel, calibration/verification state, recipe and active versions
EOL-R04Valid execution evidenceApproved command and operating segment to synchronized measured channelsTime, direction, operating point, commands, values/units, controller/safety state and raw-evidence reference
EOL-R05Decision and validityValid run to versioned pass/fail/invalid logicCalculation, limit/tolerance input, valid-run rule, result, defect code and logic version
EOL-R06Exception and relationshipInvalid, retest, quarantine, rework or override to the original recordReason, containment, original link, authorized action, approver and new-result relationship
EOL-R07Data and handoff acknowledgementDecision to database/MES, label, routing and downstream stateWrite acknowledgement, report/raw-data reference, label/route state and recovery
EOL-R08Release and sign-offComplete linked chain to authorized unit dispositionFinal state, open item, witness/owner, authority, timestamp and retained baseline

Stage boundary

Evidence limit: This is a Weiheng-authored review and traceability structure. It publishes no cycle time, capacity, accuracy, repeatability, GR&R, yield, lifetime, certification, customer, project or acceptance results. A completed worksheet improves traceability; specific performance and acceptance still require the referenced project records and authorized sign-off.